Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Steel Bailey bridge/ compact 200
Next

Steel Bailey bridge/ compact 200

FOB Price

Get Latest Price

300 / Piece

|

1 Set Minimum Order

Country:

China

Model No:

HD200 or model 321

FOB Price:

300 / Piece Get Latest Price

Place of Origin:

ZHEJIANG

Price for Minimum Order:

300 per Piece

Minimum Order Quantity:

1 Set

Packaging Detail:

standard container packings

Delivery Time:

30 to 120days

Supplying Ability:

50000 Ton per Year

Payment Type:

T/T, L/C

Product Group :

-

Contact Now
Free Member

Contact Person Mr. GAO

184 Suxi Rd., Wuxi, Jiangsu

Contact Now

Product Specification

Product Description

Steel Bailey Bridge
Bailey Bridge is one kind of prefabricated bridge, which is composed of panels and assembled together to withstand various lengths and strengths allowing the crossing of vehicles.

It is easy to be mounted without help of truck cranes in some remote areas, which means to finish installation only by hands of human power. But it will be better to use crane and launching tools for installation surely.
It is also called as portable steel bridge, compact **0 panel bridge, Mabey bridge, or temporary prefabricated bridge with pedestrian. 

There are two models, namely Compact **0 and **0 bridges in international market.  In China, there are two sizes of panels accordingly, i.e. 3m*1.4m and 3m *2.**4m.  It can be assembled into 3.7m, 4.2m and 7.4m standard width bridges or other extra widths.  Bridge type shall be decided according to customer's requirement, especially the span, width, load and surface treatment etc. 

Standard Bailey bridge (AASHTO) is a portable pre-fabricated truss bridge, designed for use by military engineering units to bridge up to *0 m (**0 ft) gaps. It requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in trucks, and the bridge is strong enough to carry tanks and heavy trucks. It is considered a great example of military engineering as temporary bridge. Bailey bridge continues to be produced and used today for various civil projects in China .

Country: China
Model No: HD200 or model 321
FOB Price: 300 / Piece Get Latest Price
Place of Origin: ZHEJIANG
Price for Minimum Order: 300 per Piece
Minimum Order Quantity: 1 Set
Packaging Detail: standard container packings
Delivery Time: 30 to 120days
Supplying Ability: 50000 Ton per Year
Payment Type: T/T, L/C
Product Group : -

Send a direct inquiry to this supplier

To:

Mr. GAO < YITAI Heavy Machinery Co., Ltd, China >

I want to know: